Search This Blog

Studebaker M15A-20 "Mr. Potato Head"

Saturday, May 10, 2014

To Do List for Dover DE Studebaker International Meet

Thought I would gen up a list of to dos before the Dover meet. The meet will be 100+ miles away and our stay will be ~week so I'll need to be prepared for what can happen.

1. Install hitch
  • Drill, weld and paint
2. Install trailer light converter
  • Finish building converter
  • Build outlet
  • Route wiring
3. Linseed oil truck
4. Treat bed and stakes
5. Install CDI ignition
  • Move bull horn
  • Mount CDI box
  • Rewire ignition w/connectors
  • Build
  • Test distributor points plate
  • Test w/CDI, old school, & Pertronix, verify timing
6. Install Sun Tach
  • Move bull horn
  • Build battery-less sensor box
  • Bench test
  • Mount sensor box
  • Wire up
  • Mount Tach
7. Install Spotlight
  • Drill and mount
  • Wire
8. Pack
  • Starter
  • Carb
  • Distributor plate w/Pertronix
  • Tools
  • Fan belt
  • Motor oil
  • Coolant
  • Gear oil (tranny & differential)
  • Fuses
  • Spark plugs
  • Coil
  • Spare keys
  • Gasket Sealer
8. Grease chassis
  • Drag link
  • Tie rod
  • King pins
  • Drive shaft slip joint
  • U-Joints
  • Clutch/brake shaft
9. Oil change
  • Stop leak
  • Filter
  • Change diaper
10. Clean and oil air filter
11. Check tire pressure
12. Check fluids
  • Tranny
  • Differential
  • Coolant
  • Brakes