Search This Blog
Studebaker M15A-20 "Mr. Potato Head"
Wednesday, August 1, 2012
Monday, July 30, 2012
New Bed Started
This is the substructure made of 4x4s. MCA treated SYP. Frame runners are two 4x4s stacked. Joists are six 4x4s. Side 4x4s are notched with the joists. All attached together with 1/2" x 6" SS lag bolts.
This how the Deck Grabber goes on. It screws to the joists and then is screwed to the deck boards when they are installed.
Here is a mock-up of a deck board and the angle iron edge. Deck board will actually go all the way to the edge of substructure. 3/8" x 6" flat head SS bolts will attach all the layers together; substructure side boards, substructure joists, deck boards, and angle iron.
Closeup of the notching
SS lag bolts inset
One screw in the Grabber. These screws are the Lox type.
View of inside of Grabber
Box of Grabber and screws
Monday, July 23, 2012
Stereo Installation
Panel installed, concealing the stereo. Can't really see the wired remote but it is mounted on the drivers door near the door latch handle.
Panel removed for access of stereo. Wires are extension cables that go to the glove box where I can plug in a thumb drive or other audio device like a digital player. I now use a real dinky thumb drive that just plugs into the front of the stereo.
Back of panel. magnets are JB Welded in place and covered with tape to protect the dash paint from scratches. I have since got a tip from STF to replace the tape with that soft stuff the coats tool handles. On the face of the panel I cut screws off and JB Welded them in place so it looks like the panel is screwed on...
Wednesday, June 20, 2012
Valve Adjustment
I now have (56,001.7 - 54,349.3) 1,652.4 miles on this new rebuild and it is time to adjust the valves after the cam, lifters, and valves have broken in. Valve clearance is supposed to be 0.016" but I found all of them to be between 0.017" and 0.018" so I did not adjust them here are the as measured clearances:
SEQ
|
EC/IO
|
ADJUST
|
CLEARANCE
|
1
|
1I
|
6I
|
0.018”
|
3
|
5I
|
2I
|
0.017”
|
5
|
3I
|
4I
|
0.017”
|
6
|
6I
|
1I
|
0.0175”
|
8
|
2I
|
5I
|
0.018”
|
9
|
4I
|
3I
|
0.018”
|
7
|
1E
|
6E
|
0.018”
|
10
|
5E
|
2E
|
0.018”
|
2
|
3E
|
4E
|
0.018”
|
4
|
6E
|
1E
|
0.018”
|
11
|
2E
|
5E
|
0.018”
|
12
|
4E
|
3E
|
0.0175”
|
I also did a compression test on all cylinders:
CYLINDER
|
PSI
|
1
|
104
|
2
|
104
|
3
|
102
|
4
|
104
|
5
|
105
|
6
|
110
|
All six plugs look the same
Insulators bright white and ground electrode light gray
Manifold and valve covers removed
Front bank
Rear bank
Sunday, June 17, 2012
Fathers Day Sully Car Show
Awesome day at Sully. They had over 400 cars. About 4 Stude cars showed and my truck was put in the heavy commercial category.
Before all the cars showed
MPH waited to check in
Oldies cheking in
Lots of Model A's
And the occasional Duece-in-a-half
More military
191 Harley
A Caddy like the one we had when we were kids
The five Stude cars that showed
Another view
MPH
Flee Market had lots of old stuff
The trophy I won
Cars and live music
Friday, June 15, 2012
New Doors!
Finally got the new doors installed on the truck. One door I bought from CA on ebay and the other I bought from Vern in KS. Did a little MIG work on the bottoms, some paint, new cat whiskers, and rubber. Ride is so much nicer with out all the noise from the windows flopping around in the doors. Also added a drivers side lock...
Subscribe to:
Posts (Atom)

































